USA (Roseville, California) – Crossing Right of Way Infrastructure Service
Budget
Looking for Proposal
Scope of Work
(1) Vendor needs to provide crossing right of way infrastructure service to the government authority located in Roseville, CA.• INSTALLATION• All storm vault modules are provided with integrated lifting anchors or cast-in lifting inserts designed for safe handling.• Lifting shall be performed with equipment of adequate capacity (cranes, excavators, or equivalent) based on module size, weight, depth of installation, and site access.• Rigging shall only be attached to the designated lifting points shown on the drawings. straps, chains, or rigging shall be of appropriate capacity and arranged to prevent damage to concrete edges.• Never lift a module by pipe openings, access hatches, or non-designated points.• Modules shall be set true to line and grade as shown on plans.• Use a guide line or tag line to control swing during placement.• Place modules carefully to avoid impact with adjacent units.• For multi-level storm vault configurations, ensure bottom modules are fully seated before placing upper modules.• Install gaskets, sealants, or jointing material per manufacturer’s instructions where required.• Bridge slabs or top slabs shall only be set once lower modules are aligned and secured.(2) The contract period will be for one year.
Eligibility
- Onshore (USA Organization Only);
Place of Performance
Performance of the work will be Onsite.