USA (The Villages, Florida) – Fire Station Renovation Services
Budget
Looking for Proposals
Scope of Work
(1) Vendor needs to provide fire station renovation services to the government authority located in The Villages, FL.- Project consists of interior renovation and minimal exterior renovation - interior demolition and removal of the existing features, followed by renovation, provide design, engineered plans and installation of a fire sprinkler system as required per code and constructing additional 883 square footage underroof and 617 square footages of outdoor covered area in accordance with engineered plans, specifications, and construction documents.- All materials and workmanship shall be first class and shall conform to the highest industry standards or the specifications, whichever requirements are more stringent.- Contractor shall be responsible for obtaining all required construction permits and bonds, if required, prior to construction.(2) All the questions must be submitted no later than July 10, 2026.(3) Mandatory pre-bid Conference will be held on June 30, 2026.
Eligibility
Onshore (US Organization Only)
Place of Performance
Performance of the work will be Onsite.
Pre-Proposal Date
June 30, 2026
Questions & Answers Deadline
July 10, 2026